276°
Posted 20 hours ago

Marflow Shower PL8 - Shower Fixing Plate (PL8) 2 Year Guarantee PL8

£7.325£14.65Clearance
ZTS2023's avatar
Shared by
ZTS2023
Joined in 2023
82
63

About this deal

Enables rigid fixing of any exposed bar valves with 150mm centres to 15mm pipework protruding through the cavity wall surface. With the PL8, it allows you to set up your pipes in the wall, then fit the wall, and then finally assemble the thermostatic bar. Adjustable depth: Reduces the need for depth planning during the "second fix" stage - suitable for any tile thickness. Design: Innovative patented plate design eliminates lateral skew when tightening fixings; Chamfered compression nuts for easy and controlled tightening.

Shower Fixing Kit | Bar Shower Fixing Kit | Marflow

Install Ø15mm copper hot and cold feed pipes ensuring they will protrude approximately 60mm from the finished wall surface.

Drawn from generations of experience, we have built our enviable reputation on a solid foundation of designing products that are beautifully engineered, fit for purpose, high performing and great value. Using a pipe slice cut the copper pipes to ensure that the shower mixer cover plates meet the finished wall. The MARFLOW Wall Fixing Plate PL8 designed to enable rigid fixing of exposed bar shower and bath/shower valves with 150mm pipe centres to concealed Ø15mm pipework, protruding through cavity wall surface. In fact the shower pipes could run down from the loft down the wall, and the bath taps from the current pipes from below, is that feasible?

Shower Fixing Brackets/Plates? | DIYnot Forums Shower Fixing Brackets/Plates? | DIYnot Forums

The Bristan type that Hotdog mentions are identical but don't have the mounting plate to space the pipes apart. It can be used to quickly install accurate pipework for exposed valves with 150mm centres, providing a secure fixed wall anchor for your bar shower valve. Install 15mm copper hot and cold feed pipes ensuring they will proturde approximately 60mm from the finished wall surface. The steel plate is fixed into the wall cavity during the "first fix" stage with a simple clamping device that holds the pipes in position, perfectly square and at the correct distance apart.serves them right for changing there mind to have a mixer shower from electric after i had run the pipe work and rebuilt the wall. The PL8 is secured to the noggin, and then there's 2 short stubs of pipework, which should be fairly resilient; as long as you're holes for the pipes aren't too large, then there shouldn't be an issue. Once fitted the bar valve is extremely secure (can withstand a direct pull force of 130kg with no defects).

Asda Great Deal

Free UK shipping. 15 day free returns.
Community Updates
*So you can easily identify outgoing links on our site, we've marked them with an "*" symbol. Links on our site are monetised, but this never affects which deals get posted. Find more info in our FAQs and About Us page.
New Comment